Flatbed freight rates change week to week and swing with construction and manufacturing seasons. Per-mile flatbed and step deck averages are published by private freight data companies, not by government sources. The useful frame is the same as for any equipment: know where published rates come from, then judge each offer against your own floor, per mile and per day. Start with the rate floor calculator.
Who publishes flatbed trucking rates?
Private data companies, described from their own pages checked November 27, 2026. DAT Freight & Analytics shows national spot rate charts on its free Trendlines page, including flatbed, which it says are derived from its RateView data. Truckstop describes rate data products for its users on its own site. Neither is quoted here; read their own terms before reusing any figure.
Why is flatbed pay per mile discussed apart from van?
Because the work is different. A flatbed load can need chains, straps, edge protection and tarps, plus an hour or more at each end to secure and tarp. Some loads are over-dimensional and need permits. Load and unload times are longer. Demand follows building and factory seasons, not retail. Those differences mean flatbed offers and van offers move on different schedules, and publishers track them as separate series.
What this guide does not do is quote flatbed rates per mile as a premium over van. A premium figure means nothing without a named source, date and equipment definition, and none is free and official.
Why does a flatbed need the per-day test?
Because time is where open deck loads lose money. Two loads can pay the same per mile, and one can take a day longer because of tarping and a slow crane. The per-mile test passes both. The per-day test catches the slow one.
Here is an EXAMPLE flatbed with its daily need, from the calculator.
| Line | Arithmetic | Result |
|---|---|---|
| Monthly cost | 4,970 fixed + 0.8529 x 8,500 miles + 5,500 owner pay | $17,719.68 |
| Loaded miles | 8,500 x (1 - 0.18) | 6,970 |
| Floor per loaded mile | (17,719.68 + 1,800) / 6,970 / 0.93 | 3.0113, shown $3.02 |
| Floor on all miles | (17,719.68 + 1,800) / 8,500 / 0.93 | 2.4693, shown $2.47 |
| Daily need | (4,970 + 5,500 + 1,800) / 20 | $613.50 |
EXAMPLE Illustrative inputs, not market data. Per-mile results round up to the next cent; dollar results round to the nearest cent. Open these inputs in the calculator.
Now the minimum pay per trip, the larger of the mile test and the day test:
| Loaded miles | Trip days | Mile test | Day test | Minimum pay |
|---|---|---|---|---|
| 100 | 1 | $302 | $772 | $772 (day test) |
| 250 | 1 | $753 | $940 | $940 (day test) |
| 500 | 2 | $1,506 | $1,879 | $1,879 (day test) |
| 750 | 2 | $2,259 | $2,159 | $2,259 (mile test) |
| 1,000 | 3 | $3,012 | $3,098 | $3,098 (day test) |
| 1,500 | 4 | $4,517 | $4,317 | $4,517 (mile test) |
Every trip up to 500 loaded miles is set by the day test, at the default of one day per 500 total miles. Add a day for tarping on a 500-mile load and the minimum pay rises by one daily need, grossed up for the fee, while the miles stay the same. That extra amount is the number to ask for as tarp pay.
One truck, MC 14 months, fee 7%. Monthly cost $16,081.54. Daily need $486.36.
The interactive version loads here. Without script, the method, formula and worked example on this page give the same result.
Full version with the rate sheet: rate floor calculator.
What about step deck?
Step deck trailers carry taller freight that will not clear legal height on a flat deck: machinery, equipment and some building materials. The trailer costs more, some loads need permits, and there are fewer loads per week for many carriers. All three push the floor up and make revenue per day the figure to watch. See the EXAMPLE step deck floor on the step deck dispatch page, where permits are averaged into fixed costs.
What moves flatbed spot rates?
Season, region and fuel. Construction and manufacturing activity set demand. Regional balance matters: lanes out of steel and lumber regions often pay differently from lanes back into them. Diesel moves your costs and, through surcharges, part of the offer. The U.S. average retail diesel price was $5.695 per gallon for the week of November 23, 2026, up $1.864 from a year earlier (EIA).
How should I judge a flatbed offer today?
Published flatbed trucking rates per mile blur thousands of loads into one figure; your offer is one load on one lane. Add the empty miles to the pickup. Estimate the days, including tarp and securement time. Run it through the offer check with your floor and daily need. If it clears both, it pays for your truck whatever the national average says. If it clears per mile but not per day, ask for tarp pay or detention terms before you approve.
Does flatbed pay more because of tarps?
Often it pays separately for tarps: many flatbed offers add a tarp charge per load on top of the linehaul. Whether it is enough depends on your tarp wear and the time it takes. Treat tarp pay as part of total pay, and test the total per mile and per day. If tarp pay does not cover the extra hours, the per-day test will show it.
What about permits and oversize?
Oversize loads add permit costs, sometimes escorts, and sometimes daylight-only travel, which adds days. Put the permit cost into the trip, count the extra days, and run the offer check. An oversize load can look strong per mile and still fall short once the days are counted.
How do flatbed carriers usually set more than one floor?
By load type. A common setup is one floor for untarped freight and a higher one, or a minimum tarp charge, for tarped freight. Some add a separate number for oversize loads that need permits and daylight travel. Each floor comes from the same costs; what changes is the time and gear each kind of load uses. Tell your dispatcher which floors you use, and every offer is matched to the right one before it reaches you.
What does the weekly report show a flatbed carrier?
The pattern behind the seasons. Over a few weeks it shows how many loads were tarped, how many cleared per day as well as per mile, and where the truck waited. A flatbed that clears its floor per mile on most loads but falls short per day on tarped ones has a clear fix: ask for tarp pay, or raise the tarped floor. A flatbed short on both in winter months may need a different plan for those months, such as other lanes or more home time, rather than a lower floor.
Which free data says anything about flatbed demand?
Indirectly, the freight volume index on the public data panel, which covers for-hire freight across modes, and diesel prices, which move your costs. Neither is specific to flatbed truck freight rates or to open deck freight in general. Construction and manufacturing activity drive flatbed demand, but no free official series turns that into a flatbed rate. That is one more reason to lean on your floor and the offers you actually see.
Questions carriers ask
What is the average flatbed rate per mile?
There is no official one. Private publishers such as DAT show national flatbed spot averages on their own pages, built from loads in their systems, and those change weekly. Your flatbed rate per mile target should be your floor, because it includes your tarp time, securement and empty miles.
Why are flatbed rates discussed separately from van rates?
Because open deck loads cost more time and gear: securement, tarps, load and unload time, and permits on some freight. Flatbed demand also follows construction and manufacturing seasons rather than retail. So flatbed offers and van offers move on different schedules and are tracked as separate series.
How do I account for tarping in my floor?
Two ways. Put tarp wear and replacement into other fixed costs in the calculator, and either set a separate higher floor for tarped loads or ask for tarp pay per load. Then test tarped offers per day, because the extra hours are where tarped loads fall short.
Are step deck freight rates higher than flatbed?
Step deck freight is often taller and less common, and the trailer costs more, so step deck pay is usually discussed as its own category. No free official source publishes a step deck rate, so this guide does not quote a premium. Your step deck floor is the figure to hold offers to.
When are flatbed spot rates strongest?
Flatbed demand commonly rises with spring and summer construction and falls in winter, but timing varies by region and year. Watch a publisher's own weekly chart over several weeks rather than assuming a calendar. Your floor stays the same whatever the season.
What per-day number should a flatbed clear?
Your daily need: fixed costs, your pay and your profit target divided by your working days. In the EXAMPLE on this page that is shown in the worked table. A load that takes two days must leave twice that after fuel, running costs and the fee.
Apply / ticket
Open deck carrier? Send your floor
Two short steps: your truck, then how to reach you. A dispatcher reviews every ticket and replies by the channel you choose.
Sources checked
SOURCES- DAT Freight & Analytics, Trendlines checked November 27, 2026
- Truckstop, Rate Insights product page checked November 27, 2026